*  Constructions & Material Details Rs.1400/- per Sqft. ( Measured by Roof }

*  We are proud to construct the residences of Army officers, Civilian officers, Business men in Dehradun and its sorrounding areas and handing over to them with their complete satisfaction and happiness.We have also experience in rennovation work for the building .

Foundations & Plinth
FOUNDATION SHALL BE 2'-6"WIDE AND 3'-0" DEPTH.
FOUNDATION FOR COLOMNS SHALL BE 3'-0"WIDEAND 4'-0"DEPTH.
3'-0"X3'-0" IRON BAR JALI FOR EVERY COLOUMNS.
1ST LAYAR 4" BAJRI WITH CEMENT 1:8 (1CEMENT:8COARSESAND).
EACH STONE FIXED WITH CEMENT AND COARSESAND1:8(1CEMENT:8COARSESAND) UP TO GROUND LEVEL.
CHAKTKA BRICK WORK SHALL BE DONE 18"WIDE BRICKS -1LAYERS,14"WIDE BRICKS -2LAYERSAND 9"WIDE BRICKS UP TO PLINTH LEVEL.
CHTAKA BRICK WORK START FROM GROUND LEVEL TO PLINTH BEAM LEVEL.
PLINTH BEAM 9"X9" WITH 4 IRON BAR-10M.M. (M.S. BAR).
AFTER PLINTH BEAM WE USE 1" DPC WATER PROOFING AND DAMP PROOFING WITH CEMENT AND DUST.
ONE LAYER TARPAUL IN FOR WATER PROOFING AND CEEPAGE.
ANTI-TERMITE TREATMENT OF ISI MARK SHALL BE DONE IN FOUANDATION AND FLOOR.
FOR ALL WORK CEMENT SHALL BE USED J.P./ACC/AMBUJA / BANGUR.
WE USED TEHRI/SIDHBALLI TMT STEEL(IRON RODS).
R.C.C Work
R.C.C. COLOUMNS (9"X9")SHALL BE- 2BARS-12M.M.AND 4BARS-10M.M.
PLINTH BEAM AND DOOR BEAM 4 BARS-10M.M.
6M.M. RINGS FOR BEAMS AND COLOUMNS (1' DISTANCE).
R.C.C. ROOF SLAB 4.5"THICK.
PLINTH 02'-6"AVERAGE HEIGHT INCLUDING BEAM FROM GROUND LEVEL.
GROUND FILLING BY EARTH AND MALWA.
PLINTH BAND 9"X9" WITH 4BARS 10M.M. & 6M.M. RING @1'DISTANCE.
DOOR BAND 9"X6" WITH 4BARS 10M.M. & 6M.M RING @1'DISTANCE.
Roof Work
STEEL PLATE SHUTTRING.
WE USE TEHRI / SIDHBALI STEEL BARS.
ELECTRIC CONDUIT PIPE KALINGA.
AS PER REQUIREMENT CONCEAL LIGHTS AND FAN BOX .
CURING OF ROOF 5DAYS CONTINEOUSLY.
3'-0"HEIGHT PARAPET WALL (4.5" brick wall).
IN FRONT OF HOUSE WE USE M.S. DESIGN RAILING OR STEEL RAILING.
WATER PROOF GROUTING.
WOOD WORK
WINDOWS AND CHAUKHATS WILL BE SAL WOOD (5"X2.5").
DOORS PALLA IN GOLDEN TEAK WOOD FROM WITH 19 M.M. BOARD (ISI MARK).
MAIN DOOR WILL BE DESIGNED FANCY DOOR.
GOLDEN TEAK WOOD FRAME WINDOW IN DOUBLE PALLA INCLUDING WINDOW GRILL, ONE SIDE IRON FLY MESH AND OTHER SIDE MODI SUN GLASSESPALLA.
IN EVERY BEDROOM WE PROVIDE AN ALMIRAH WITH 19 M.M. BOARD AND TEAK PLY 4 M.M.
STONE WORK
FLOOR STONE rs60/= PER SQFT.
FLOOR TILES rs70/= PER SQFT.
7' HEIGHT WALL TILES (KAJARIA / SOMANEYA / ORINT) rs45/= PER SQFT IN BATHROOM.
2'6" HEIGHT WALL TILES UP TO KITCHEN COUNTER.
L- SHAPE KITCHEN GRANITE STONE- rs220/=PER SQFT.
WE USE A STEEL SINK IN KITCHEN Rs.3500/-.
BEFORE FIXING OF STONE WE USE ANTI TERMITE TREATMENT (ISI MARK).
GRANITE FINISHED POLISH ON FLOOR.
ELECTRIC WORK
WE USE MODULAR CONA SWITCHES.
KALINGA / ISI MARK CONDIUT PIPE 1" DIA .
KALINGA WIRES 2M.M., 1.5M.M, 1.0M.M., 0.75M.M.
INVERTER WIRING IN EVERYBED ROOM, KITCHEN, BATHROOM, LOBY, DRAWING ROOM,VERANDA.
EXHAUST FAN POINT, GEYSER POINT IN KITCHEN AND BATHROOM.
WE PROVIDE TWO DOOR BELL SWITCH- GATE AND VERANDA.
SPEAR M.C.B. BOX IN EVERY FLOOR.
WE PROVIDE MAIN METER AND SUB METER FOR EVERY FLOOR.
A.C POINT AND BLOWER POINT IN EVERY BED ROOM.
WE PROVIDE T.V. AND L.C.D .POINTS.
SANITORY WORK
WE USE HINDUSTAN / HINDWARE / WESTERN OR INDIAN SEAT.
WE USE JAGWAR TABS / SHOWER / HAND SHOWER / HOT AND COLD MIXER.
SEPRATE LINE FOR SOLAR WATER.
WE USE G.I. PIPES 1/2"(JINDEL HISAR / T.T SWASTIK).
PLASTIC WATER TANK 500LT. WILL BE FIXED ON THE ROOF.(GANGA GOLD).
WE PROVIDE A UNDER GROUND WATER TANK 4500LT WITH FIXING OF LOCAL TILES.
ONE TAP OUT SIDE FOR GARDEN PURPOSE.
WE MAKE A WATER MOTOR POINT.
ONE TAP ON THE ROOF FOR ROOF CLEANING.
WHITE WASH WORK
DESIGNER P.O.P. WORK ON ROOF.
J.K. / BIRLA PUTTY WILL BE USED - OUT SIDE WALL AND IN SIDE WALL.
OIL BOUND PAINT - INSIDE (ASIAIN / BERJOR).
APEX PAINT - OUT SIDE WALL (ASIAN / BERJOR).
WOODEN POLISH WORK.
ONE WALL IN DRAWING ROOM WITH DISONAR TRACTHOR PAINT.
STAIRS CASE
DESIGNED MS RAILING OR STEEL RAILING .
MARBLE STONE FLOORING WITH MOULDING.
ONE STORE ROOM OR TOILET UNDER STAIRS.
Payment Shedule

* 1 ADVANCE -------------5%

* AFTER DIGGING OF FOUNDATION --------- 5%

* AFTER FIXING OF COLOUMNS AND STONE WORK IN FOUNDATION -----------10%

* ON PLINTH LEVEL --------------10%

* ON DOOR BEAM LEVEL ------------10%

* ON ROOF LEVEL -------------- 10%

* ON ROOF CASTING ------------ 15%

* WOOD FOR DOORS AND WINDOWS ----------- 03%

* ON IN SIDE PLASTER ------------- 05%

* ON OUT SIDE PLASTER ------------ 02%

* ON FLOORING ------------- 10%

* ON INTERNAL G.I. PIPES AND ELECTRIC PIPES --------- 05%

* ON ELECTRIC WIRING ----------- 02%

* ON SAINTARY WARES ------------ 05%

* ON COMPLETION OF WORK ---------- 03%